top of page

LAKESIDE GYM CONVERSION

Bannockburn, IL

PROJECT HIGHLIGHTS:

CHALLENGES

  • New facility was designed for under-utilized garage and vacated data center in the lower level.

  • Design required engineered drawings to be adapted to existing conditions.

​

SOLUTION

  • Clarion carpenters built up 18-24 inches of uneven concrete in underground garage to prepare construction-ready floor.

  • Experienced Clarion Project Manager, carpenters and laborers, bridged the gap between missing details in the design and on-site conditions.

  • Clarion brought utilities to raw space – HVAC, electrical and plumbing were all design-built.

IN-HOUSE SERVICES:

  1. HVAC, electrical, and plumbing

  2. Glazing

  3. Painting

  4. Lockers

  5. Specialty flooring

CLIENT: REIT Management & Research

PROPERTY MANAGER: REIT Management & Research

ARCHITECT: Wright Heerema

OWNER: Commonwealth REIT