
HOSPITAL FLOOD REPAIR
Undisclosed, IL

PROJECT HIGHLIGHTS:
-
Emergency response to a post-holiday flood caused by a frozen pipe in a 6th-floor medical operatory
-
Identified secondary system failure from a ruptured heating coil leaking boiler water into ductwork
-
Immediate on-site stabilization, cleanup, and protection of sensitive surgical equipment
-
Rapid coordination of multiple trades, including HVAC, electrical, drywall, and fire sprinkler systems
-
Comprehensive repairs addressing insulation, ductwork, ceilings, and water-damaged finishes
-
Full operatory sterilization and restoration completed within 72 hours
-
Surgical space returned to full operational use in three days
-
Minimized disruption to hospital operations and preserved patient care during a critical holiday period
-
Proactive system corrections implemented to reduce future risk and improve long-term reliability
IN-HOUSE SERVICES:
-
Emergency Service
-
Ceiling Tile Replacement
-
Drywall Repair
-
Insulation Replacement
-
Fully Operational within Three Days
INDUSTRY: Medical



