PROJECT HIGHLIGHTS:

CHALLENGE

  • Architect’s and owner’s vision was to completely modernize the look of the lobby.

  • Drawings used were mostly conceptual.

  • Work was being done to and around all exits of the building

​

SOLUTION

  • Clarion carpenters covered existing granite with drywall and painted the walls so they meshed well with existing flooring. All lighting was replaced or retrofitted. Granite desk was removed and replaced by new stone security desk. Light wall was constructed to be focal point of lobby.

  • Clarion worked to transition the concepts imagined by the architect to real materials and finishes used in the space.

  • Safe traffic patterns were set up to enable all tenants to stay open during construction without disruption.

SERVICES:

  1. New Sconce Lighting

  2. Carpet Inset

  3. Paint Drywall

  4. Custom Lumicor Panels

  5. Custom Security Desk

“Clarion Construction did an exceptional job on a complicated lobby project – going the extra mile to ensure the architect’s concept and the specified materials were completed as
envisioned. Planning and communication with the account manager and superintendent were superb
, their staff kept a clean job site at all times, respectful and accommodating in a high traffic area – not once did I receive a noise complaint, and the accounting was swift and accurate. I am continually impressed by the Clarion team.”

- Tom Heneghan, Sr. Project Manager, CBRE

OWNER: EQUITY OFFICE
CLIENT/ PROPERTY MANAGER: CBRE
ARCHITECT: GONZALEZ