ADVOCATE HEALTHCARE
Crystal Lake, IL

PROJECT HIGHLIGHTS:
CHALLENGE
-
Build out was on the second floor of a building
-
that did not have a freight elevator.
-
Physical therapist office was constructed in a completely raw space.
-
Medical office required unique finishes not
-
typical in office projects. Due to the nature of the tenant, it was necessary to go above and beyond ADA standards.
SOLUTION
-
A window was removed and materials were hoisted up and through the opening. Window was replaced upon completion of the project.
-
Clarion’s Project Manager met with the tenant on a weekly basis while also working closely with
-
tenant’s finish designer as well as therapists
-
to ensure the space would meet all needs of
-
those occupying it.
-
Clarion carpenters installed shatterproof mirror walls and heavy duty hooks for swings in both adult and children’s gyms. Additionally, several automatic handicap doors were installed throughout office.
IN-HOUSE SERVICES:
-
Painting
-
Carpet Installation
-
Specialty Hooks
-
Mirror Wall
-
Custom Millwork
OWNER: AMERICAN REALTY CAPITAL HEALTHCARE TRUST, INC.
CLIENT/ PROPERTY MANAGER: NAI HIFFMAN
ARCHITECT: ANDERSON MIKOS ARCHITECTS LTD.